© Architects: ARGE Gesamtplanung WPW Ingenieure GmbH, IFB Dr. Braschel GmbH, Saarbrücken
Industrial & Production Plant, Office Buildings

BMW Plant, Leipzig

Additional value

  • All short- and long-term costs could still be clearly defined during the planning phase

Individual services

  • Facility management
  • Consulting on life cycle costs
Client

BMW AG

Architect

ARGE Gesamtplanung WPW Ingenieure GmbH, IFB Dr. Braschel GmbH, Saarbrücken

Location

Leipzig, Germany

Gross floor space

500,000 m²

Project duration

January 2002 – January 2004

The new BMW plant required planning and cost certainty from the initial groundbreaking ceremony through to normal operations at a later date. The plant structure is characterised in such a way that the three main production halls (body shop, paint shop and assembly) are grouped in a circular design around a central administration, communication and services building (central building). As a result, the production areas are closely interlinked.

© Architects: ARGE Gesamtplanung WPW Ingenieure GmbH, IFB Dr. Braschel GmbH, Saarbrücken