© SBEV GmbH/optify GmbH
Logistics & Transport

LCM® City Train Europaviertel

Client

Stadtbahn Europaviertel Projektbaugesellschaft mbH (SBEV)

Location

Frankfurt am Main, Germany

Project term

December 2018 to May 2019

Other

Construction of a new two-track light railway line, about 2,750 meters long,

One underground station and three stations above ground level

The city of Frankfurt am Main plans to develop the transport infrastructure for the Europaviertel district by extending the urban railway route Stadtbahn B. The overall project comprises the construction of a two-track light railway line with a length of about 2,750 meters from Frankfurt Central Station, which will be operated in future as part of the subway line U5.

Mehrwert

  • Creation of transparency about the necessary work packages and the preparatory work
  • Promotion of collaborative cooperation
  • Verification of the existing timeline and definition of contractual deadlines for the tender processes
  • Joint solutions to problems/conflicts
  • Indication of the potential for improvement of the timeline

 

Teilleistungen

  • Lean Construction Management (LCM®)
  • Overall process evaluation
  • Process planning
© SBEV GmbH/optify GmbH
© SBEV GmbH/optify GmbH
© SBEV GmbH/optify GmbH
© SBEV GmbH/optify GmbH