© boanet.at
Educational & Research Institutions

University of Economics and Business, Vienna

Additional value

  • Costs and schedule spot on
  • Control of construction, technology and installation issues from a single source
  • Flexibility in the implementation of the requirements in terms of cost control
  • Smooth construction process due to preliminary analyses of the construction logistics concept
  • Green Building certification (five buildings certified ÖGNI/DGNB silver and one building is certified ÖGNI/DGNB gold)

Individual services

  • Project control according to HO-PS, similar to AHO/DVP
  • Project communication software (PCM)
  • CONTRACE defects management
  • Green building certification according to DGNB/ÖGNI (German Sustainable Building Council/Austrian Sustainable Building Council)
Client

Projekt­gesellschaft Wirtschafts­universität Wien Neu GmbH

Architects

Atelier Hitoshi Abe, Sendai; BUS-Architekten, Vienna; Crab Studio, London; Estudio Carme Pinos, Barcelona; NO.MAD Arquitectos, Madrid; Zaha Hadid Architects, Hamburg

Location

Vienna, Austria

Project duration

February 2008 – March 2014

Size of plot of land

90,000 m²

Usable floor space

100,000 m²

Gross floor space

165,000 m²

Gross volume

770,000 m³

The new campus of the Vienna University of Economics and Business accommodates up to 25,000 students and 1,500 staff. One of the challenges of the 492-million euro project was to implement the designs of internationally renowned architects on schedule and within budget.

© boanet.at
© boanet.at
© boanet.at
© boanet.at
© boanet.at
© boanet.at
© boanet.at
© boanet.at