© Bülow AG
Office Buildings

CONSTRUCTION OF ‘ONE’ OFFICE BUILDING, STUTTGART-VAIHINGEN

Client

Bülow AG, Stuttgart

Location

Stuttgart, Germany

Architect

Bülow AG

Project duration

January 2016 – Autumn 2018

The Bülow Group has built an Innovation Center in Stuttgart-Vaihingen for the Swedish company Trelleborg Sealing Solutions. Integrating offices, laboratories and a company restaurant, the building has total floor area of 13,800 square meters.

The design of the five-and-a-half floors allows flexible use and implementation of all standard workplace types. The building features a Z-shape above the ground floor, which maximizes natural light and open-plan offices. It also results in the creation of two roof-top terraces. A multipurpose central zone accommodates important functions such as meeting areas, copy and archive zones, as well as communication alcoves. Think tanks can also be integrated as retreat areas, if required.

Added value

  • Adherence to budget and schedule
  • Successful implementation of the high-energy efficiency concept

Service elements

  • Integrated Construction Management
  • Coordination of occupational health and safety measures