The new BMW plant required planning and cost certainty from the initial groundbreaking ceremony through to normal operations at a later date. The plant structure is characterised in such a way that the three main production halls (body shop, paint shop and assembly) are grouped in a circular design around a central administration, communication and services building (central building). As a result, the production areas are closely interlinked.

Additional value

  • All short- and long-term costs could still be clearly defined during the planning phase

Project data

Client:

BMW AG

Location:

Leipzig, Germany

Gross floor space:

500,000 m²

Project duration:

January 2002 – January 2004

Individual services

  • Facility management
  • Consulting on life cycle costs

Location map