Industrial & Production Plant, Logistics & Transport

German Aircraft

Client

German Aircraft

Location

Leipzig/Halle Airport

Project duration

2021 - 2024

Land area

62.000 m²

As a new German aircraft manufacturer, Deutsche Aircraft is pursuing the strategy of not only using climate-friendly technologies in the long term, but also enabling climate-neutral flight operations in the near future. Against this backdrop, the D328eco provides the right answers to the key challenges of today's mobility and climate change. Furthermore, with its competitive cost per seat mile and best-in-class economics, it offers the right answer for the aviation sector. With this step, the company is making a decisive contribution to the technological transformation of aviation and is also positioning itself as a pioneer in this field.

In addition to developing future aircraft concepts, Deutsche Aircraft is currently focusing on the construction of an ultra-modern and climate-neutral final assembly line for the D328eco at Leipzig/Halle Airport. An efficient value chain is of crucial importance for the production of the world's most modern turboprop aircraft and for the region of Saxony. The entire production process will take place in the final assembly line at Leipzig/Halle Airport, which is developing into an important aviation hub with a strong air logistics infrastructure.

Drees & Sommer supported the company with a comprehensive service package, which was handled by an integrated team consisting of experts from various fields. End-to-end software solutions are used to ensure high efficiency and environmental compatibility during production. These form the foundation for a versatile and sustainable factory.

Drees & Sommer unterstützte das Unternehmen hierbei mit einem umfangreichen Leistungspaket, das von einem integralen Team bestehend aus Expert:innen verschiedener Kompetenzbereiche abgewickelt wurde. Für eine hohe Effizienz und Umweltverträglichkeit während der Produktion sicherzustellen, kommen durchgängige Softwarelösungen zum Einsatz. Diese bilden den Grundstein für eine wandlungsfähige und nachhaltige Fabrik.

Added value

  • Clear project structure with unambiguous responsibilities
  • Continuous project support from the user requirement through planning and tendering to the handover of the keys
  • Cross-discipline user needs assessment and derivation of the resulting requirements
  • Efficient project management through the integral coordination of all planning services
  • Reduction of interfaces and synergies through interdisciplinary teamwork
  • Flexible material flow and resource-optimized factory layout
  • Ensuring high sustainability standards

Individual Services

  • User requirement buildings, production and logistics
  • Master plan for site development
  • Integrated factory planning
  • Production and logistics planning
  • Technical project management
  • Investment consulting
  • Energy consulting
  • BIM consulting