© Hôpitaux Robert Schuman S.A.
Healthcare Buildings

New extension of the Kirchberg hospital

Architects

Groupement Extension CHK (Baumschlager Eberle Architekten / Christian Bauer Associés Architectes)

Project duration

January 2021 - September 2039

Hospital capacity

Expansion to include additional medical areas (A areas)

The new extension of the Kirchberg hospital is intended to improve medical care and infrastructure at the hospital. 

The project includes the extension of an 18-storey new building, the partial addition of storeys to existing structures to expand the existing central operating theatre, the expansion of the emergency room and the existing sterile supply department, and the complete renovation of the existing central operating theatre. 

These measures are intended to help increase the efficiency and quality of medical services.

Added Values

  • Carrying out the renovation while the hospital remains in operation
  • Ensuring continuous patient care
  • Coordination of various departments and trades

Services

  • Project management
  • Organisational and process consulting
  • User project management
  • BIM management
  • Industry-specific consulting
  • Scan-to-BIM
© Hôpitaux Robert Schuman S.A.
© Hôpitaux Robert Schuman S.A.
© Hôpitaux Robert Schuman S.A.