Educational & Research Institutions

Medical University Innsbruck

Client

BIG Bundesimmobiliengesellschaft mbH

Location

Innsbruck

Functions
  • Offices
  • Laboratories for chemistry, biochemistry, hygiene, and microbiology
  • Auditorium for approximately 500 students
Overcome Challenges
  • Construction within existing structures
  • Complex construction site logistics
  • Tight inner-city space constraints
  • Complex excavation pit support
  • Structural reinforcement of the existing load-bearing structure
  • Complex temporary underpinning of the load-bearing structure
  • High level of installations