Educational & Research Institutions
Medical University Innsbruck
Client
BIG Bundesimmobiliengesellschaft mbH
Location
Innsbruck
Functions
- Offices
- Laboratories for chemistry, biochemistry, hygiene, and microbiology
- Auditorium for approximately 500 students
Overcome Challenges
- Construction within existing structures
- Complex construction site logistics
- Tight inner-city space constraints
- Complex excavation pit support
- Structural reinforcement of the existing load-bearing structure
- Complex temporary underpinning of the load-bearing structure
- High level of installations