Office Buildings

Tabakfabrik Linz GmbH

Client

TF-Linz GmbH – A company of the Bodner Group

Location

Linz

Project Duration

From 05/2019 during the preliminary design phase of the project until approximately Q2/2020 (operating cost allocation model)

Services
  • Planning Support  
  • Lifecycle Costs  
  • Operator  
Results
  • Operational Concept  
  • Logistics Concept  
  • Waste Management Concept  
  • Garage Concept  
  • Measurement and Metering Concept  
  • Operating Cost Calculation  

At the site of the old tobacco factory in Linz, the western part of the area, known as "Areal Neubau 3," is being redeveloped. On a gross floor area of approximately 46,000 m² above ground and 18,000 m² underground, multifunctional uses such as a hotel, offices, residential spaces, a school, a kindergarten, retail, and more are planned.

The project has been supported since the preliminary design phase, during which all logistical and operationally relevant processes were simulated and linked to the expected lifecycle costs.

The primary goal of our consulting services is the operational concept, focusing on logistics, waste management, and garage operations. Additionally, through the overarching operational strategy to be defined, an operational management concept will clarify and document the scope, sourcing level, and operational interfaces in connection with the planned uses.n Input zu CAFM und Serviceprozessen zu leisten.