Healthcare Buildings

MED CAMPUS Graz

Client

Medical Universität Graz

Location

Graz

Developer and Owner

BIG Bundesimmobiliengesellschaft

Project Duration

2013 - 2017

Services
  • Planning Support  
  • Lifecycle Costs  
  • Operations  
  • Commissioning  
  • Organization  
  • Tendering  
  • CAFM  

    Service Period 2014 – 2017  

Results
  • Estimation and calculation of follow-up costs for the entire building operation  
  • Definition of the operator strategy  
  • Development of the performance matrix and the operator concept  
  • Description of the organizational structure and workflows (organizational chart and key processes)  
  • Preparation of the specifications and execution of the facility service tender  
  • Development of the commissioning plan and support during the start-up phase of the technical operator  
  • Professional support for the implementation of the CAFM system  

With the construction of the MED CAMPUS in Graz-Ries, the fourth university location in Graz is being established. The previously dispersed university medical facilities across the city are now being brought together under one roof, close to the LKH-University Hospital Graz. On two adjacent construction sites, the development of a modern university and communication center is planned, which will pave new ways in the core areas of teaching and research.

Due to the significant centralization of medical teaching and research and the required high building quality, new logistical and operational challenges arose at the MED CAMPUS.

During the submission planning phase, the project "Transitioning the MED CAMPUS into Operation" brought us on board with a focus on lifecycle costs and the realignment of building operations.

The objective was to comprehensively describe all services and tasks required for operating the MED CAMPUS in a timely manner, define the organizational interfaces between users, operators, and FM service providers, and establish the necessary internal structures in advance.