Client

Bern University of Applied Sciences

Project data

October 2015 - September 2016

With the new Campus Biel/Bienne (CBB) building, Bern University of Applied Sciences is planning to merge the two departments of Architecture, Wood and Civil Engineering (AHB) and Engineering and Information Technology (TI) at one location. The new building will be occupied in 2021. As part of this project, a CAFM system was to be procured to further professionalise the FM services. Drees & Sommer Switzerland was commissioned to draw up the requirements for this CAFM system with the project team, to manage the procurement process and to accompany the implementation.

Added value

  • Transparent service procurement
  • Efficient project management
  • Basics for procurement and implementation
  • Role models and descriptions for the new organisation at the Biel/Bienne campus

Individual services

  • Development of a catalogue of requirements with the project team, based on standards (GEFMA 440) 
  • Developing the basis for the tender and carrying out the tender
  • Development of CAD / CAFM and BIM guidelines in coordination with the Amt für Grundstücke und Gewerbe (AGG)
  • Development of CAFM concept as a basis for implementation with detailed role descriptions and formulation of the complex processes