© Basler Verkehrs-Betriebe
Quarters & Developments, Industrial & Production Plant, Logistics & Transport

New Bus Garage Rank service centre, Bus System 2027 programme

Client

Basler Verkehrs-Betriebe

Project duration

2021 - 2027

Location

Basel

Architect

Itten Brechbühl AG

Construction volume

CHF 125 million

Drees & Sommer Switzerland is supporting Basler Verkehrs-Betriebe as the client's representative in the project management of the new construction of the Rank garage, an essential part of the overall programme. The new building consists of two utilisation units: Workshop and parking facility. The latter will be equipped with charging stations designed for e-buses. The support of temporary locations distributed throughout the city will ensure that the provision and operation of the bus system is guaranteed in the transition from diesel and gas to electric. BVB will convert its entire bus fleet to electric buses by 2027. This will make the fleet more environmentally friendly and quieter than the current buses.

Added value

As part of the Bus System 2027 Infrastructure programme, we are supporting Basel's transport operators to make lasting changes to the future of Basel.

Individual services

  • Project management client ad interim
  • Client representation
  • Quality management
  • Risk management
  • Data management
  • Project management third party utilisation
Electric bus Basel
© Basler Verkehrs-Betriebe
Omnibus
© Basler Verkehrs-Betriebe
Energy bus
© Basler Verkehrs-Betriebe