Quarters and Developments

Beach Pier, Hamburg

© DC Development GmbH & Co. KG

CLIENT 

PE Strandkai c/o DC Developments GmbH & Co. KG

LOCATION 

Hamburg, Germany

PROJECT DURATION 

06/2017 – 06/2021

EXCAVATION PIT DEPTH 

Approx. 8,00 m

BASEMENT FLOORS 

2

TYPE OF CONSTRUCTION

sheet pile walls, bored pile walld, and jet grouting

BASE 

approx. 15,500 m²

SOIL EXCAVATION 

approx. 72,400 m³ 

In recent years, the Quartier “Quartier am Strandkai” , which consists of numerous apartments, has been built in HafenCity Hamburg.

The excavation pit, which is surrounded on three sides by water, was constructed to withstand planned flooding in the event of a storm surge. A sophisticated pressure relief drainage system ensured the pit's smooth operation until flooding occurred. 

ADDED VALUE 

  • Demanding a high-performance water drainage due to proximity to the Elbe River and open construction method
  • High risk of flooding of the excavation pit due to relatively low flood protection target

PARTIAL SERVICES

  • LP 6–8 for excavation pit and deep foundations
  • Excavation pit management (planning and execution phase) 