Systematic Construction Solutions
As the client’s representative, we manage complex new construction and renovation projects. Innovative tools and agile methods help us steer construction sites flexibly and efficiently.
SYSTEMATIC CONSTRUCTION SOLUTIONS – HOLISTIC SERVICES FOR EVERY PROJECT PHASE
With decades of experience, we bring broad expertise across all cost groups, focusing on our core competency: the service phases (SP) 6–9 of the German Schedule of Services and Fees for Architects and Engineers (HOAI). Our know-how spans from new builds to modernizations, covering residential, office, administrative, and retail properties, as well as life science facilities, hospitals, and highly complex special buildings.
We represent our clients before, during, and after execution. By applying Integral Construction Management and lean methodology, we bundle all services across cost groups 200 (demolition and preparation), 300 (structural works), 400 (technical building systems), and 500 (outdoor facilities) throughout the entire project lifecycle – from tendering to building operation.
SAFETY, STRUCTURE, AND QUALITY THROUGHOUT THE ENTIRE PROCESS
With our holistic approach to construction management, you benefit from numerous advantages:
- Reliable scheduling and structured implementation with LCM: By using LCM Digital, we can secure the construction process transparently while identifying and solving ruptures at an early stage. This allows us to stay on schedule throughout the project.
- Cost certainty: Our project controlling team always keeps an eye on costs and identifies potential savings at an early stage. We quickly see opportunities and risks which we share with our clients immediately.
- Seamless planning and construction: Throughout the entire construction process, we follow an integral and holistic approach. This ensures smooth planning and construction and maximizes efficiency.
- Quality Management: From the very beginning to prevent potential defects.
- Everything from a single source: We provide all expertise in-house in interdisciplinary teams.
EXPERTISE
For efficient construction and optimal results, structural design and technical building equipment must work hand in hand. That’s the core of Systematic Construction Solutions.
Learn MoreOur team of experts oversees the tendering and awarding of contracts. They examine plans for potential savings and technical optimization. Our experts prepare tenders, evaluate offers, and use 5D BIM models for precise contract processes.
Learn MoreOur specialists provide monitoring in HOAI service phase 8. We have expertise across cost groups 300 (building works), 400 (technical equipment), and 500 (outdoor facilities).
Learn MoreWe apply our Lean Site Management philosophy to projects and collaborations. Our methods allow us to reduce waste and increase value. Our LCM Expert Center trains staff, while LCM Digital supports transparent site management.
Learn MoreConstruction logistics are key to a smooth operation. Construction sites are known for their complex and unique infrastructure due to their environment in city centers, factory zones, or tourist areas. They require complex and unique logistics. We plan and coordinate logistics carefully to ensure smooth operations.
Learn MoreYour success begins as early as the excavation pit. We consider each building’s unique characteristic to stay on schedule and within budget. Our engineering services range from excavation and foundations to demolition, always avoiding interfaces for a seamless operation.
Mehr erfahrenNews
Let's talk.
We’re happy to help.





![[Translate to English:] Bülow AG](https://cdn.dreso.com/fileadmin/_processed_/4/6/csm_Stuttgarter_Hoefe_Titelbild_Copyright_Buelow_AG_2029b3a99e.jpg)
![[Translate to English:] TRUMPF](https://cdn.dreso.com/fileadmin/_processed_/6/b/csm_TRUMPF_Education_Center__c_TRUMPF_Group-1_cb8adbc740.jpg)
![[Translate to English:] The Office Group](https://cdn.dreso.com/fileadmin/_processed_/6/1/csm_TOG_Pressehaus_Berlin_The_Office_Group-4_ea3083c58e.jpg)
![[Translate to English:] vision photos](https://cdn.dreso.com/fileadmin/_processed_/c/4/csm_Maritim-HCC_Ingolstadt__c_vision_photos_a8b440b149.jpg)