© Franz&Sue
Bildungs- und Forschungseinrichtungen

Berufsschulzentrum Konstanz

Client

District of Constance, Office for Building Construction and Building Management, Constance

Location

Constance, Germany

Architecture

Franz und Sue ZT GmbH

Project duration

July 2017 – December 2028

Gross floor area

27.883 m²

Gross volume

144.000 m³

Conference seating

318

Refectory seating

208

The district of Constance wants to merge the two vocational schools Zeppelin-Gewerbeschule and the commercial Wessenberg-Schule into the new joint "Berufsschulzentrum Konstanz" at the Zeppelin-Gewerbeschule site. 

The existing buildings will be demolished in four interlinked construction phases between 2022 and 2028. High-quality new buildings with rooms for natural sciences, workshops, a canteen, an archive and a three-court sports hall will gradually be built. Sustainable concepts will be applied in the changing educational landscape. These include flexible teaching and learning environments, places of retreat and collaboration areas. The future vocational school center is also impressive from an energy perspective: It meets the requirements of the NBBW (Sustainable Building Baden-Württemberg) and has achieved DGNB Gold status. In addition, further building blocks from the Cradle to Cradle® approach will be integrated. 

Drees & Sommer managed the planning competition in accordance with RPW for the project planning services as well as other planner selection procedures in accordance with VgV, UVgO. In addition, the company was awarded the project management contract and a mandate for sustainability consulting. Drees & Sommer was also responsible for workshop planning.

Mehrwerte

  • Bundled expertise from a single source 
  • Individual solutions for all project challenges
  • Reduced complexity, structured processes
  • Compliance with cost and schedule targets from feasibility study with cost calculation 
  • Well thought-out execution concept for the construction phases
  • Active involvement and practical introduction of sustainability issues

Leistungen

  • Inventory assessment
  • Feasibility study
  • Technical condition assessment
  • Architectural competition according to VgV, GWB
  • Planner selection VgV, UVgO
  • Project entry, project management stage 1+2 (service profile according to AHO across all stages, several interlinked and consecutive construction phases, different areas of use)
  • Workshop planning
  • Sustainability consulting NBBW, DGNB, C2C
© Franz&Sue
© Franz&Sue
© Franz&Sue
© Franz&Sue
© Franz&Sue