© arus GmbH
Educational & Research Institutions

Restoration of assistance to youth at pallotti

Client

Pallottiner Jugendhilfe und Bildungswerk GmbH

Location

Neunkirchen, Saarland; Germany

Planning

arus GmbH Willi Latz

Project duration

08/2019 – 06/2024

Gross surface area

1800m²

Surface according to DIN 227: 1.700m²

The Pallotti school is a state-recognized private school specializing in social development, located in Neunkirchen in the Saarland region of Germany. Prior to the project, the building – built in 1975 – was still in its original state and thus no longer satisfied current technical standards. Drees & Sommer Luxembourg was in charge of building services engineering as part of the school's renovation project. The renovation includes, among other things, the replacement of the roof, the facades including the windows and floor coverings, as well as the replacement of the technical installations (sanitation, water and heat supply, ventilation, electrical installations).

All of the works are carried out while maintaining the school’s functioning.

The project was launched in August 2019 and is slated for completion in summer 2024.

Added Value

  • Modernization
  • Renovation while maintaining the school’s functioning

Services

  • Building Services Engineering
© arus GmbH