REX - Expansion of production of active ingredients + New laboratory building and energy control centre

Additional value

  • Overall coordination of simultaneously running projects
  • Integration of specific building and laboratory experience into planning and implementation
  • Exact adherence to schedule and cost specifications
  • High level of quality and efficiency

Individual services

  • Cost and planning check
  • Contract management
  • Schedule planning
  • Cost controlling
  • Reporting
  • Site scheduling management
Client

Rentschler Biotech­nologie GmbH, Laupheim

Architect / Planner - Laboratory building

Carpus + Partner AG (general planning)

Location

Laupheim, Germany

Laboratory building - Gross floor space

5,168 m²

Laboratory building - Gross volume

19,955 m³

Project duration

August 2006 – March 2008

In buildings 3 and 4, already existing production rooms were refurbished and expanded into GMP production areas for the purpose of expanding the production of active ingredients. In addition, a new laboratory building was constructed for the purpose of increasing the capacity of the quality control system and concentrating various laboratory at the Laupheim location. Moreover, a new energy control centre was also established to supply the entire plant.