© Jochen Stüber
Healthcare Buildings

Schwarzwald-Baar District Hospital

Additional value

  • Opened on schedule
  • Reducing future operating costs due to design of space tailored perfectly to hospital processes
  • Security through services related maintenance contracts, audit documents and defect management
  • Implementation of future-oriented ecological and technical concepts 

Individual services

  • Project Control
  • Technical and Economic Construction Consulting
  • Facility Management Consulting
  • Defect Management
  • Commissioning and Operational Support
Client

Schwarzwald-Baar Klinikum Villingen-Schwenningen GmbH

Usable floor area

44,556 m²

Gross volume

415,000 m³

Project duration

July 2006 – July 2013

The realization of the Schwarzwald-Baar District Hospital – one of the largest in Germany – ensures contemporary healthcare for the local population. Design of space tailored perfectly to hospital processes will reduce future operating costs.

© Jochen Stüber
© Jochen Stüber