Office Buildings
Haus zum Falken, Zurich
LEED Gold for iconic new building connecting Stadelhofen station with downtown Zurich
An iconic new building replaces the former Haus zum Falken and creates a dynamic connection between Stadelhofen station and central Zurich. In addition to retail space at street level and office workspace on the four upper floors, the new Haus zum Falken also houses underground bicycle parking. Technical systems generate electricity on the green roof.
Efficient creation of an architectural icon
Drees & Sommer supported the client and ensured the ambitious planning by the architectural firm Calatrava Valls was implemented efficiently. The building not only scores points for design but also meets the requirements of a sustainable new building. This is demonstrated not least by the sustainability certification according to the LEED Gold Standard, which the Drees & Sommer team helped its client achieve.
Added Value
- Sustainability certification according to the LEED Gold Standard
- Exceeds Swiss building standard for energy requirements "Minergie P"
- Urban initiative for sustainable urban mobility strengthened
- Architecturally sophisticated planning efficiently implemented
Services
- Client support
- LEED Gold Certification
Impressions
© Drees & Sommer
© Drees & Sommer
© Drees & Sommer Are you facing a similar challenge?
Get in touch with us!
We´re happy to help.
© Drees & Sommer
![[Translate to English:] Team V Architectuur [Translate to English:] Team V Architectuur](https://cdn.dreso.com/fileadmin/_processed_/1/a/csm_924_crossover_210429_avond-beeld-snelweg_crop_fd3f1fd6c5.jpg)
