Industrial and Production Plant, Laboratory Buildings

Miltenyi Biotec, Cologne

A brownfield site transformed into a state-of-the-art manufacturing facility and laboratory specializing in cell and gene therapy, designed to meet regulatory requirements

© Miltenyi Biotec

Client

Miltenyi Biotec B.V. & Co. KG  

Location

Cologne, Germany

Project duration

August 2020 – December 2027

Other Characteristics

- Usable floor area: approx. 12,000 m²
- Laboratories and specialist facilities designed according to cleanroom classifications
- Will meet Good Manufacturing Practice (GMP) regulatory requirements 

Miltenyi Biotec is a leading manufacturer in the cell and gene therapy industry, operating in a rapidly growing and highly specialized market. The company serves over 6,000 customers worldwide, employs approximately 4,500 people, and offers a portfolio of over 19,000 products. To make advanced therapies more accessible to patients faster and more cost-effectively, Miltenyi Biotec is expanding its existing campus in Cologne.  The brownfield site was previously used for manufacturing and packaging operations. Once complete, the “Cologne Clinical Products Miltenyi Biotec” (CPMB) facility will provide new office space, upgraded technical infrastructure, and dedicated production areas for clinical-grade reagents, supporting the company’s expanding clinical operations. 

Elements of the existing brownfield building and structure will be restored and repurposed. To meet Good Manufacturing Practice (GMP) regulatory requirements, the facility is being upgraded with digital infrastructure and state-of-the-art technology. The design includes clearly defined cleanroom classifications for sterile production processes, along with controlled personnel and material flows to maintain compliance and operational efficiency. A decentralized energy system incorporates both high- and ultra-high-temperature heat pumps is expected to significantly reduce both CO₂ emissions and overall energy consumption.


Comprehensive Support from brownfield site to life sciences center 

We are supporting the client with a comprehensive range of services, including a digital building automation audit for commissioning and control, as well as project management to help ensure adherence to budget and schedule objectives. Through Building Information Modelling (BIM) management, our team integrates planning, construction, and operational processes into a single centralized building model. This approach enables transparent, traceable, and quality-assured project delivery while improving coordination and increasing efficiency throughout every phase of the project. 

Added value

  • Delivered in alignment with schedule and budget objectives
  • Transparent, traceable, and quality-assured project execution that enhances cross-functionality collaboration and improves efficiency across all project phases
  • An innovative energy strategy designed to reduce energy consumption and CO₂ emissions
  • Strengthening global competitiveness while reinforcing Germany’s position as a leader in biotechnology
  • Accelerating the delivery of high-quality therapies to more patients in a faster and cost-effective manner 

Services

  • Project Management
  • Technical Project Control
  • BIM Management
  • Digital Building Automation Audit for Commissioning Control  

“Brownfield projects are particularly challenging: We repurpose existing spaces and prepare them for new uses. From the outset, we integrate Good Manufacturing Practice (GMP) guidelines into planning and construction. At the new Cologne site, an innovative energy concept significantly reduces energy consumption and CO2 emissions.” 

Harald GräfeManager and Pharmaceutical Facilities Expert, Drees & Sommer
Go to projects

Are you facing a similar challenge?

 

Get in touch with us!

We´re happy to help.

 

SUBJECT_1