Industrial & Production Plant

Construction of new direct reduction plant at the SALCOS® site

© Salzgitter AG

Client:

Salzgitter Flachstahl GmbH

Location:

Salzgitter

Architect:

Several project planners

Project duration:

01.05.2023 to 31.10.2026

Salzgitter Flachstahl GmbH (SZFG) supports Germany’s international commitment  to reduce greenhouse gas emissions. To this end, the company established the SALCOS® “Salzgitter Low CO2 Steelmaking” transformation program. As part of the transformation, the former coal-basedproduction process will be gradually replaced by a new, hydrogen-based steel production process. The completion of the final stage in 2033 will result in a reduction of up to 95 percent of today’s annual direct carbon emissions of around 8 million tonnes. This means that the Salzgitter site alone can save around one percent of German carbon emissions. All SALCOS® subprojects are being realized on the Salzgitter Flachstahl GmbH site.

 

 

Added values

  • Optimization and support for construction and assembly processes
  • Optimization of construction scheduling
  • Supporting the principal in their role
  • Identification, coordination and control of collision avoidance in the 3D model
  • Preparation of crane concepts and construction site equipment planning 

 

Services

  • Installation and construction site planning including installation coordination
  • BIM management (DRP and EAF)  
  • Subproject management and project management for cost groups 300 to 500
  • Risk management
  • Site supervision
  • Construction logistics planning and control
  • EPCM Return material loading
  • Interface management – construction/plant/logistics 

 