News and Insights

Welcome to our Shared Content Center! This is where you will find news, current developments and interesting stories about our company and the topics that keep driving us forward. We share information here, about our projects, innovations and events, in a variety of formats, such as blog posts, press releases and files. If you want to keep yourself updated, you're in the right place. 

News

Latest First: In our news articles, you’ll find everything we currently have to report.

Press

Sports Facilities in Oberstdorf Ready for Four Hills Tournament

© Sportstätten Oberstdorf / Florian Speigl

When the world's best ski jumpers try to set new records at the Schattenberg ski jump on 29 December, it will have involved record time and a logistical tour de force by Germany's southernmost town. The snow melting in spring and the new snowfall in winter set a narrow timeframe for the major construction work; the fine-tuning will follow next spring and in summer. As a result, the sports facilities can be tested even before the World Ski Championships in 2021. ‘In order to ensure that the sports facilities were filled with sportspersons rather than construction machinery at the start of the World Cup events at the end of December, the construction work was carried out under enormous time pressure,’ explained Florian Speigl, project manager of the construction program. ‘More than 100 tenders had to be dealt with within a very short period so that the firms could start work on time,’ added Christina Dohmann, Project Partner at Drees & Sommer. The planning company is responsible in particular for ensuring that budgets and schedules are adhered to. Back in 2005, the company had supervised the construction work for the last World Ski Championships in Oberstdorf.

Final Spurt for Work on Ski Jumps and Cross-Country Trails

Dug-up slopes, mountains of gravel and construction machinery – just a few days ago, construction work on the ski-jumping arena was still in progress. In the cross-country skiing center, interior finishing work is still ongoing in the new functional building.

The work on the outdoor facilities was completed just in time as the first snow fell. Various measures have been implemented to increase safety and comfort for sportspersons, visitors and staff. In the ski-jumping stadium, excavators dug up the slope in order to model the new small jumps. As working on the steep slopes was particularly difficult for these large machines, they were secured with winches. An underpass was dug under the slopes for the athletes. As a result, they no longer have to cross the other ski jumps. Two new small jumps replace the old ones. New side fences were also set up. They are anchored into the slope with numerous micro-bored piles. The refurbishment also includes new wind nets, extended steps on the large ski jump, an inclined elevator and a new athletes' area with wax rooms, storage space and recreation rooms.

Excavated and blasted rock was re-used in the cross-country skiing center as processed gravel material to re-model the trails. They are now wider and the descents are less hazardous. In the cross-country skiing center, a pond was created for snow-making and a functional building was constructed with an athletes' area, changing rooms, wax rooms and storage space. A new cold hall for training was also added. While the two sports facilities are intended for professionals, other sportspersons were also taken into account: a tunnel for the tourist trail was built in one section of the professional cross-country ski runs.

More News

Blog posts

Get new insights into the work of Drees & Sommer and learn more about current topics, projects and trends.

Press

Sports Facilities in Oberstdorf Ready for Four Hills Tournament

© Sportstätten Oberstdorf / Florian Speigl

When the world's best ski jumpers try to set new records at the Schattenberg ski jump on 29 December, it will have involved record time and a logistical tour de force by Germany's southernmost town. The snow melting in spring and the new snowfall in winter set a narrow timeframe for the major construction work; the fine-tuning will follow next spring and in summer. As a result, the sports facilities can be tested even before the World Ski Championships in 2021. ‘In order to ensure that the sports facilities were filled with sportspersons rather than construction machinery at the start of the World Cup events at the end of December, the construction work was carried out under enormous time pressure,’ explained Florian Speigl, project manager of the construction program. ‘More than 100 tenders had to be dealt with within a very short period so that the firms could start work on time,’ added Christina Dohmann, Project Partner at Drees & Sommer. The planning company is responsible in particular for ensuring that budgets and schedules are adhered to. Back in 2005, the company had supervised the construction work for the last World Ski Championships in Oberstdorf.

Final Spurt for Work on Ski Jumps and Cross-Country Trails

Dug-up slopes, mountains of gravel and construction machinery – just a few days ago, construction work on the ski-jumping arena was still in progress. In the cross-country skiing center, interior finishing work is still ongoing in the new functional building.

The work on the outdoor facilities was completed just in time as the first snow fell. Various measures have been implemented to increase safety and comfort for sportspersons, visitors and staff. In the ski-jumping stadium, excavators dug up the slope in order to model the new small jumps. As working on the steep slopes was particularly difficult for these large machines, they were secured with winches. An underpass was dug under the slopes for the athletes. As a result, they no longer have to cross the other ski jumps. Two new small jumps replace the old ones. New side fences were also set up. They are anchored into the slope with numerous micro-bored piles. The refurbishment also includes new wind nets, extended steps on the large ski jump, an inclined elevator and a new athletes' area with wax rooms, storage space and recreation rooms.

Excavated and blasted rock was re-used in the cross-country skiing center as processed gravel material to re-model the trails. They are now wider and the descents are less hazardous. In the cross-country skiing center, a pond was created for snow-making and a functional building was constructed with an athletes' area, changing rooms, wax rooms and storage space. A new cold hall for training was also added. While the two sports facilities are intended for professionals, other sportspersons were also taken into account: a tunnel for the tourist trail was built in one section of the professional cross-country ski runs.

Dreso-Blog

Press Releases

Find out more about the latest developments and exciting news from our company in our current press releases.

Press

Sports Facilities in Oberstdorf Ready for Four Hills Tournament

© Sportstätten Oberstdorf / Florian Speigl

When the world's best ski jumpers try to set new records at the Schattenberg ski jump on 29 December, it will have involved record time and a logistical tour de force by Germany's southernmost town. The snow melting in spring and the new snowfall in winter set a narrow timeframe for the major construction work; the fine-tuning will follow next spring and in summer. As a result, the sports facilities can be tested even before the World Ski Championships in 2021. ‘In order to ensure that the sports facilities were filled with sportspersons rather than construction machinery at the start of the World Cup events at the end of December, the construction work was carried out under enormous time pressure,’ explained Florian Speigl, project manager of the construction program. ‘More than 100 tenders had to be dealt with within a very short period so that the firms could start work on time,’ added Christina Dohmann, Project Partner at Drees & Sommer. The planning company is responsible in particular for ensuring that budgets and schedules are adhered to. Back in 2005, the company had supervised the construction work for the last World Ski Championships in Oberstdorf.

Final Spurt for Work on Ski Jumps and Cross-Country Trails

Dug-up slopes, mountains of gravel and construction machinery – just a few days ago, construction work on the ski-jumping arena was still in progress. In the cross-country skiing center, interior finishing work is still ongoing in the new functional building.

The work on the outdoor facilities was completed just in time as the first snow fell. Various measures have been implemented to increase safety and comfort for sportspersons, visitors and staff. In the ski-jumping stadium, excavators dug up the slope in order to model the new small jumps. As working on the steep slopes was particularly difficult for these large machines, they were secured with winches. An underpass was dug under the slopes for the athletes. As a result, they no longer have to cross the other ski jumps. Two new small jumps replace the old ones. New side fences were also set up. They are anchored into the slope with numerous micro-bored piles. The refurbishment also includes new wind nets, extended steps on the large ski jump, an inclined elevator and a new athletes' area with wax rooms, storage space and recreation rooms.

Excavated and blasted rock was re-used in the cross-country skiing center as processed gravel material to re-model the trails. They are now wider and the descents are less hazardous. In the cross-country skiing center, a pond was created for snow-making and a functional building was constructed with an athletes' area, changing rooms, wax rooms and storage space. A new cold hall for training was also added. While the two sports facilities are intended for professionals, other sportspersons were also taken into account: a tunnel for the tourist trail was built in one section of the professional cross-country ski runs.

More Press releases

Social Media Wall

Have you followed us on LinkedIn and Instagram yet? This is where you'll find the content that we've shared most recently on our company channel. 

 

 

Current publications

Explore an overview or discover interesting details: Here you can find our latest published material, covering a range of topics.

Sustainability Report 2024

You can download our Sustainability Report 2024 here.

Download

Sustainability Report 2023

Forward-looking sustainability: Drees & Sommer is committed to sustainable corporate development that reconciles long-term economic success with ecological and social goals.      

Download

INNOVATION SCOUTING REPORT

On the trail of innovation: Find out more about the most important technology trends for the construction and real estate industry.

Download

Dossier

The future lies in existing buildings: existing properties offer huge potential not only economically, but also ecologically and functionally.

Download

Futureproofs

Looking back and looking ahead: Drees & Sommer Group business figures, statements and forward-looking topics and projects.

Download

Trend Study 2024

Corporate Real Estate Management - Digitalization and sustainability

Download

Digital Transformation Study

Digital Transformation in the Construction and Real Estate Industry: A Central European Perspective

Download

Drees & Sommer Logo

Download
Teaser Drees & Sommer Logos
Symbol Podcast

BLUE WAVES: The podcast for the world of construction and real estate

This is the Drees & Sommer podcast that explains more about the fascinating world of buildings, infrastructure, industry and urban development. Whether you're an industry insider or just curious about the world around us, Blue Waves provides insights into the real-estate industry for everyone. We discuss the topics that affect all of us.

 

this way

Events

Drees & Sommer uses various event platforms (real, digital or hybrid) to engage in dialog with customers and business partners.

Learn more
Teaser Event