Logistics & Transport

RIEDBAHN, FRANKFURT AM MAIN

General refurbishment of busy railroad line completed in record time

© Deutsche Bahn AG / Georg Wagner

CLIENT

DB InfraGo AG, Frankfurt am Main  

LOCATION

Railway line between Frankfurt am Main and Mannheim

PERFORMANCE PERIOD

January 2020 - December 2025 

This central infrastructure project is inspiring: Since mid-December 2024, long-distance, regional and freight trains have been running again on the Riedbahn line. The success of the project was celebrated with the official inauguration of the track. Drees & Sommer supported Deutsche Bahn (DB) with a wide range of services. A special feature of the project is that the general refurbishment of the Riedbahn will be used as a template for the comprehensive upgrade of some 1,500 km of track in the highly congested DB network through 2027.

Launched with interdisciplinary expertise and steered to the finish line

A Drees & Sommer team used Lean Construction Management (LCM) to ensure the efficiency of  processes. The specialists also contributed their expertise with a range of services, such as project and contract management, as well as project and schedule control. The interdisciplinary team supported DB with the renewal of all technical systems and the modernization of stations along the line section. Since the beginning of 2020, Drees & Sommer has also been involved in the renewal and renovation of several Riedbahn interlocking systems.

The aim was to improve the operational quality of the systems and to ensure their availability. Anticipatory planning with digital management tools instruments was indispensable for logistics. This ensured that all components were available on site and on time despite any material and resource shortages or unreliable supply chains. 

Added values

  • Track refurbishment in record time
  • Seamless professional client support throughout the entire project

Services

  • Project control
  • Digital processes and tools
  • Lean Construction Management
  • Coordination, monitoring and control of engineering and execution services
  • Contract management
  • Schedule planning and control

“As a large but closely connected team, we successfully delivered one of Europe’s most important infrastructure projects.” 

Annette Beierl, Team Leader at Drees & Sommer

20stations modernized, upgraded to provide for barrier-free access, and made more attractive
117kilometers of new track laid to make the infrastructure fit for the future
152switches modernized and rebuilt to provide additional alternative options and increase operational flexibility
16kilometers of noise abatement walls modernized and rebuilt
1,200items of control and safety equipment bought up to the state of the art

Impressions

© Deutsche Bahn AG / Oliver Lang© Deutsche Bahn AG / Stefan Wildhirt© Deutsche Bahn AG / Stefan Wildhirt© Deutsche Bahn AG / Stefan Wildhirt© Deutsche Bahn AG / Oliver Lang

You may also be interested in these projects

Learn more

Are you facing a similar challenge?

 

Let's talk.

We look forward to hearing from you!

SUBJECT_1