Project Duration 

November 2018 – May 2021 

Other Characteristics 

- Architecture: Schmidt-Schicketanz Partner GmbH and m3 Bauprojektmanagement GmbH

- Further development and redesign of the former cathedral school in buildings 38/40 and the garden house in building 42

- Total cost: €11.5 million (gross)

- Total gross floor area: 4,800 m²  

In the eighth century, Saint Corbinian preached the Christian faith on the hill where Freising Cathedral now stands. The historic centre of the city and the co-cathedral of the Archdiocese of Munich are located there today. The entire building is characterised by Baroque architecture. The former cathedral school has been extensively modernised to include modern rooms for a full-day school, a cathedral library, a cathedral choir school, an information point and an administrative office. The basement and upper floor house rooms for servers, building connections and building services.  

Historical substance meets modern project management.

Drees & Sommer took over the planning during the implementation phase. A key objective was to preserve the Baroque architecture of the building and restore its original appearance. This includes the vaulted ceiling, columns, parts of the façade, and the unique room layout, for example. In addition to planning, Drees & Sommer was responsible for tendering and awarding the construction contracts. Close coordination with the requirements of monument protection was crucial in this process.

Added value

  • Listed archaeological site, building complex, and architectural monument renovated and cultural heritage preserved
  • Sustainable use ensured through technical equipment 

Services

  • Taking over planning during the implementation phase
  • Tendering
  • Awarding contracts and project supervision  

Impressions

© MarcusBuck.com © MarcusBuck.com © MarcusBuck.com © MarcusBuck.com © MarcusBuck.com © MarcusBuck.com 
Go to projects

Are you facing a similar challenge? 

 

Let's talk!

We're happy to help.

SUBJECT_1