Implementation

Systematic Construction Solutions

As the client’s representative, we manage complex new construction and renovation projects. Innovative tools and agile methods help us steer construction sites flexibly and efficiently.

SYSTEMATIC CONSTRUCTION SOLUTIONS – HOLISTIC SERVICES FOR EVERY PROJECT PHASE

With decades of experience, we bring broad expertise across all cost groups, focusing on our core competency: the service phases (SP) 6–9 of the German Schedule of Services and Fees for Architects and Engineers (HOAI). Our know-how spans from new builds to modernizations, covering residential, office, administrative, and retail properties, as well as life science facilities, hospitals, and highly complex special buildings.

We represent our clients before, during, and after execution. By applying Integral Construction Management and lean methodology, we bundle all services across cost groups 200 (demolition and preparation), 300 (structural works), 400 (technical building systems), and 500 (outdoor facilities) throughout the entire project lifecycle – from tendering to building operation. 

3D Scanning on Site

3D scanning brings digitalization to the construction site, saving both time and costs. Our technology records the raw construction status digitally. This innovation allows us to detect and resolve deviations between BIM planning and reality at an early stage.

Learn more

SAFETY, STRUCTURE, AND QUALITY THROUGHOUT THE ENTIRE PROCESS

With our holistic approach to construction management, you benefit from numerous advantages:

 

  • Reliable scheduling and structured implementation with LCM: By using LCM Digital, we can secure the construction process transparently while identifying and solving ruptures at an early stage. This allows us to stay on schedule throughout the project.
  • Cost certainty: Our project controlling team always keeps an eye on costs and identifies potential savings at an early stage. We quickly see opportunities and risks which we share with our clients immediately.    
  • Seamless planning and construction: Throughout the entire construction process, we follow an integral and holistic approach. This ensures smooth planning and construction and maximizes efficiency.  
  • Quality Management: From the very beginning to prevent potential defects.    
  • Everything from a single source: We provide all expertise in-house in interdisciplinary teams. 

EXPERTISE

For efficient construction and optimal results, structural design and technical building equipment must work hand in hand. That’s the core of Systematic Construction Solutions.

Learn More

Our team of experts oversees the tendering and awarding of contracts. They examine plans for potential savings and technical optimization. Our experts prepare tenders, evaluate offers, and use 5D BIM models for precise contract processes.

Learn More

Our specialists provide monitoring in HOAI service phase 8. We have expertise across cost groups 300 (building works), 400 (technical equipment), and 500 (outdoor facilities).

Learn More

We apply our Lean Site Management philosophy to projects and collaborations. Our methods allow us to reduce waste and increase value. Our LCM Expert Center trains staff, while LCM Digital supports transparent site management.

Learn More

Construction logistics are key to a smooth operation. Construction sites are known for their complex and unique infrastructure due to their environment in city centers, factory zones, or tourist areas. They require complex and unique logistics. We plan and coordinate logistics carefully to ensure smooth operations.

Learn More

Your success begins as early as the excavation pit. We consider each building’s unique characteristic to stay on schedule and within budget. Our engineering services range from excavation and foundations to demolition, always avoiding interfaces for a seamless operation. 

Mehr erfahren
ReferencesThese projects might interest you.
Press

Electromobility on the Rise: Drees & Sommer Provides Support for Automaker during Plant Conversion

An efficient construction process is important to ensure that the conversion is successful during ongoing operations. © BMW AG.

Munich, Germany, October 29th, 2024. With daily production of around 1,000 vehicles and almost 7,000 employees, the historic main site in Munich is an indispensable part of BMW's global production network. Production of the new vehicle architecture, New Class, which uses only electric drive systems, will begin here from 2026. The automaker is investing 650 million euros in a new vehicle assembly facility, including logistics areas and body manufacture. The extensive conversion work is being carried out while operations remain ongoing. Drees & Sommer SE specializes in construction and real estate consulting. The company’s interdisciplinary team supports the large-scale project with expertise in the areas of project steering, construction management and building information modeling (BIM). Together with BMW Group, PORR AG and PDE, Drees & Sommer is focusing on an innovative collaboration method. 

Maximilian Lammel, senior team head at Drees & Sommer comments: “The biggest construction challenge is the tight schedule. We started the demolition work in April 2023 – the new vehicles must roll off the production line in November 2026. During this period, the construction work must not interfere with ongoing vehicle production. For this to work, an efficient construction workflow is crucial. This requires that everyone involved in the project pulls together and communicates with each other on equal terms.

The New Delivery Model Is Based on Partnering.

For this reason, the project uses the partnering delivery method, also known as ‘general contracting in partnering’. Right from the beginning, client, planning company and construction firm interact as partners. In concrete terms this means that the teams of BMW Group, PORR AG and Drees & Sommer SE work together in each of the construction stages and mutually support each other in all phases of the project. 

“Mutual and joint responsibility improves the communication between stakeholders and enhances the quality of construction projects,“ says Maximilian Lammel. “In conventional delivery methods there are many sub-areas of responsibility, with communication being conducted via several interfaces. This often leads to misunderstandings and hampers the flow of information, especially in large-scale projects. The consequences could be disastrous. Thanks to our partnering model we are able to create a transparent and cooperative working environment. The type of collaboration used in this project promotes mutual understanding and shared responsibility for its success,” he continues. 

From the Automobile to the Construction Site: Lean Principles Accelerate the Building Process.

To ensure that the construction project is completed within the required timeframe, Maximilian Lammel and his team are applying the principles of lean management. The method is borrowed from the automotive industry: automakers know exactly when which vehicle with which equipment will roll off the production line. If there is any fault in the precisely timed production process, the response is immediate. The cause of the fault is identified and fixed as quickly as possible. On a conventional building site, on the other hand, defects often go unnoticed for a long time – sometimes so long that, at some point, all work comes to a standstill. “The lean construction management method we have developed transfers the automotive industry approach to construction projects. The planning and implementation process is set up as efficiently and in as much detail as necessary, so that all trades work together to the best possible effect,“ explains Florian Langlotz, Partner at Drees & Sommer Group and responsible for the Automotive division.

The first step was therefore to initiate communication between everyone involved. The focus was on optimizing the scheduling of the building site and the overall process, aiming at a consistent implementation plan. A clear definition emerged at the end of this planning, indicating when which employees, machines and construction materials were needed at which location and at what time – without idle time or delays due to a lack of materials or plans, and without the various trades getting in each other's way while working. The result was that the planning grid for the shell of a new assembly hall was completed in just ten days.

A Digital Twin Ensures a Maximum of Planning Security.

These minimal timeframes are made possible not only by the efficient construction work. “To avoid any nasty surprises on the building site, we use virtual planning,“ says Drees & Sommer’s senior team head Simon Rogalski, and explains: “Each building is initially planned in the form of a digital twin, which brings together all the relevant data. In this method, the construction planners not only describe the geometry of the new halls. The model can be enhanced with different kinds of data on the materials used, their cost and service life, as well as sound insulation and fire safety properties.“ This type of detailed planning does increase the planning effort at the start, but pays off over the course of the project. All parties involved in planning and construction use the same model. So, all information is immediately available. If the designs no longer match, for example, the conflicts are directly visible in the digital twin. Errors are not left unnoticed until the construction process, where they would then lead to expensive delays. Hence, virtual planning ensures maximum planning security and a close collaboration of all stakeholders.

The new halls should be up and running in two years. Auto production will then start at full speed on the main site in Munich. One year later, the Munich plant will be the first BMW Group production site in the world to manufacture only fully electric vehicles.